L.I.P.S. vs. Conventional
| LOW IMPACT |
|
CONVENTIONAL |
| |
| PLANNING |
| Plan for a unique and predetermined outcome |
|
One size fits all |
| |
| TOPSOIL STRIPPING |
| Minimal stripping (Max. 1 metre wide) |
|
Requires Min 3 to 6 meters wide |
| |
| DITCHING |
Ditch width to suit pipe diameter
(max. 2.5 X pipe dia. = ditch width) |
|
36”- 42" wide ditch for all sizes of pipe |
| |
| REPLACEMENT OF SPOIL AND TOPSOIL |
| 100% of spoil is returned into ditch line.
Ditch is compacted from the bottom up |
|
65 to 75% of spoil returned to ditch line
Ditch is compacted from the top down |
| |
| FUTURE RECLAMATION COSTS |
| minimal possibility of ditch settlement |
|
high degree of certainty of ditch settlement |
| |
| COSTS |
| minimal reclamation costs |
|
high degreeof certainty of future reclamation costs |
| |
| BENEFITS |
Reduced impact on land and water
Reduced reclamation costs
Improved land owner satisfaction
Better risk management |
|
None |